GP 2.6 Control Work Products
Summary
Place selected work products of the process under appropriate levels of control.
Description
The purpose of this generic practice is to establish and maintain the integrity of the selected work products of the process (or their descriptions) throughout their useful life.
The selected work products are specifically identified in the plan for performing the process, along with a specification of the appropriate level of control.
Different levels of control are appropriate for different work products and for different points in time. For some work products, it may be sufficient to maintain version control so that the version of the work product in use at a given time, past or present, is known and changes are incorporated in a controlled manner. Version control is usually under the sole control of the work product owner (which can be an individual, group, or team).
Sometimes, it can be critical that work products be placed under formal or baseline configuration management. This type of control includes defining and establishing baselines at predetermined points. These baselines are formally reviewed and approved, and serve as the basis for further development of the designated work products.
Additional levels of control between version control and formal configuration management are possible. An identified work product can be under various levels of control at different points in time.
Elaboration for all PAs
- Project plans
- Solicitation packages
- Measures
- Product documentation